How to Apply for a New Electricity Connection Online
Standard operating procedure approved by NEPRA for Category 1 (up to 15 kW) residential connections.
Open ENC Portal & Select DISCO
Go to enc.com.pk. Click on Apply and select your respective electricity company (e.g. FESCO, LESCO, MEPCO).
Provide Neighbor's Reference Number (Crucial)
Enter an existing neighbor's 14-digit electricity bill reference number. The system automatically fetches your exact sub-division, grid station, and local distribution feeder.
Select Connection Category & Load
Choose Category 1 for domestic residences (up to 15 kW load). Select Single Phase (typically 1โ5 kW for general homes) or Three Phase (typically 5โ15 kW for heavy load / multiple air conditioners).
Upload Scanned Documents
Upload clear scanned copies (max 300 KB each) of your CNIC, proof of property ownership (Registry / Fard / Allotment Letter), and Wiring Contractor Test Form.
Print Application & Submit to SDO Office
Print out the generated application form, sign it, and submit one physical set of attested documents to your local Sub-Divisional Officer (SDO) office.
Site Verification & Demand Notice Issuance
A DISCO surveyor/lineman visits your premises within 7โ10 days to check wire distance to the transformer. Once approved, your Demand Notice is uploaded to the portal and notified via SMS.
Pay Demand Notice & Meter Installation
Pay the Demand Notice at the designated bank (NBP, MCB, Allied, etc.). Submit the paid bank copy to the SDO office. The meter installation order (Service Order) is issued within 5โ10 working days.
๐ Required Documents Checklist
Property Ownership Proof
Attested copy of Registry, Fard Malkiat, Allotment Letter, or Sale Deed.
Applicant's CNIC
Attested photocopy of valid Computerized National Identity Card.
Witnesses CNIC (2 Persons)
Photocopies of CNIC from two neighbors or relatives acting as witnesses.
Neighbor's Paid Electricity Bill
Latest paid bill copy from adjacent premises for verification.
Wiring Test Report
Signed certificate from an authorized electrical wiring contractor.
Affidavit / Stamp Paper (If Tenant)
No Objection Certificate (NOC) on โจ100 stamp paper if applying on rented property.
Estimated Demand Notice Fee Structure (2026)
Official standard costs determined by NEPRA (National Electric Power Regulatory Authority). Exact costs depend on service wire length from the pole.
| Connection Type | Load Range | Security Deposit | Meter & Service Cost | Estimated Total Fee |
|---|---|---|---|---|
| Domestic Single Phase | Up to 1 kW | โจ1,220 | โจ6,000 - โจ8,000 | โจ7,500 - โจ9,500 |
| Domestic Single Phase | 2 kW to 5 kW | โจ2,440 - โจ4,880 | โจ7,000 - โจ9,500 | โจ10,000 - โจ14,500 |
| Domestic Three Phase | 5 kW to 15 kW | โจ6,100 - โจ18,300 | โจ25,000 - โจ35,000 | โจ32,000 - โจ54,000 |
| Commercial Single Phase | Up to 5 kW | โจ4,500 - โจ12,000 | โจ8,000 - โจ11,000 | โจ13,000 - โจ23,000 |
DISCO ENC Quick Directory
FESCO
Faisalabad Electric Supply Company
Est: โจ7,500 - โจ12,500 (Single Phase)
LESCO
Lahore Electric Supply Company
Est: โจ8,000 - โจ14,000 (Single Phase)
MEPCO
Multan Electric Power Company
Est: โจ7,000 - โจ12,000 (Single Phase)
IESCO
Islamabad Electric Supply Company
Est: โจ8,500 - โจ15,000 (Single Phase)
GEPCO
Gujranwala Electric Power Company
Est: โจ7,500 - โจ13,000 (Single Phase)
PESCO
Peshawar Electric Supply Company
Est: โจ7,000 - โจ12,000 (Single Phase)
HESCO
Hyderabad Electric Supply Company
Est: โจ7,000 - โจ12,000 (Single Phase)
QESCO
Quetta Electric Supply Company
Est: โจ7,500 - โจ13,000 (Single Phase)