Blog GEPCO

GEPCO

GEPCO Net Metering & Solar Connection Guide 2026

Apply for GEPCO net metering. Solar installation, eligibility, costs, ROI, and billing for Gujranwala, Sialkot, Gujrat, and all GEPCO districts.

GEPCO Net Metering & Solar Connection Guide 2026

Solar in GEPCO Region

The GEPCO region in northern Punjab receives 5–6 peak sun hours daily, making solar a strong investment. With rising tariffs and 2–8 hours of daily load shedding, consumers in Gujranwala, Sialkot, and surrounding districts can achieve energy independence through solar with net metering.

Eligibility

  • Active GEPCO connection
  • Solar system within sanctioned load
  • AEDB/PEC licensed installer
  • NEPRA-approved inverter
  • 1-Phase max 5 kW, 3-Phase max 1 MW
  • Meets GEPCO technical standards

Application Process

  • Install solar through licensed installer
  • Gather docs: CNIC, GEPCO bill, property papers, system specs
  • Submit to GEPCO Generation Licensing
  • GEPCO inspects installation
  • Bidirectional meter installed
  • Sign net metering agreement
  • Start exporting surplus

Net Metering Billing

ItemkWhNotes
Grid Import350Drawn from GEPCO
Solar Export280Sent to grid
Net Billed70Only pay for this
Monthly Bill~Rs 542First slab rate
Without Solar~Rs 7,000Full 350 units
Savings~Rs 6,45892% reduction

System Sizing & Costs

UsageSystemCostPayback
200–300 kWh3 kWRs 280,000–420,0003–4 years
300–500 kWh5 kWRs 420,000–600,0002.5–4 years
500–800 kWh8 kWRs 650,000–950,0003–4 years
800+ kWh10 kWRs 850,000–1,200,0003–4 years

Benefits

  • 70–100% monthly savings on electricity
  • Protection against annual tariff increases
  • 2.5–4 year payback period
  • 25+ year system lifespan
  • Property value increase
  • Sales tax exemption on solar equipment
  • Net metering credits for excess generation

Frequently Asked Questions

How to apply for GEPCO net metering?

Install approved solar, submit docs to GEPCO Generation Licensing, pass inspection, get bidirectional meter.

Cost of solar with net metering?

5 kW system: Rs 420,000–600,000 plus Rs 15,000–25,000 for meter.

How long for approval?

30–60 days from application.

Can commercial get net metering?

Yes, up to 1 MW for three-phase.

What about excess credits?

Roll over monthly. Year-end excess at NEPRA buy-back rate.

Is solar viable in Gujranwala?

Excellent — 5–6 peak sun hours daily.

Need to upgrade connection?

Only if solar exceeds sanctioned load.

Can I use batteries too?

Yes, hybrid systems with batteries are permitted.

Government incentives?

Sales tax exempt solar equipment. Some provincial financing programs.

Expected warranty?

Panels: 25 years. Inverter: 5–10 years.

← Back to all articles