FESCO Net Metering & Solar Connection — Faisalabad Guide 2026

Apply for FESCO net metering with solar panels. Eligibility, application process, billing, costs, and ROI for Faisalabad, Sargodha, and all FESCO districts.

FESCO Net Metering & Solar Connection — Faisalabad Guide 2026

Solar Energy in the FESCO Region

The FESCO region, centered around Faisalabad, receives 5–6.5 peak sun hours daily, making it excellent for solar energy generation. With rising electricity costs and significant load shedding in suburban and rural areas, solar with net metering is a compelling investment for both residential and commercial FESCO consumers.

FESCO's net metering facility allows consumers to export surplus solar electricity to the grid and receive credits on their bill. For Faisalabad's textile industry, commercial solar installations with net metering can dramatically reduce operational costs.

Net Metering Eligibility

  • Existing FESCO consumer with active connection
  • Solar system capacity within sanctioned load
  • Licensed installer with AEDB/PEC registration
  • NEPRA-approved grid-tie inverter
  • Single phase: max 5 kW; Three phase: max 1 MW
  • System meets FESCO technical standards

Application Process

  • Install solar system through licensed installer
  • Gather documents: CNIC, FESCO bill, property papers, system specs, installer license
  • Submit application to FESCO Generation Licensing section
  • FESCO inspects installation for safety and compliance
  • If approved, FESCO replaces meter with bidirectional meter
  • Sign net metering agreement
  • Start exporting surplus solar to grid

Billing Under Net Metering

ItemValueNotes
Grid Import300 kWhDrawn from FESCO
Solar Export240 kWhSent to grid
Net Billed60 kWh300 – 240
Monthly Bill~Rs 464First slab rate
Without Solar~Rs 6,000Full 300 units
Savings~Rs 5,53692% reduction
Credits roll over monthly. Excess credits at year-end may be compensated at NEPRA's buy-back rate.

System Sizing

UsageSystem SizeCostPayback
200–300 kWh3 kWRs 280,000–420,0003–4 years
300–500 kWh5 kWRs 420,000–600,0002.5–4 years
500–800 kWh8 kWRs 650,000–950,0003–4 years
800–1000+ kWh10 kWRs 850,000–1,200,0003–4 years

ROI for FESCO Consumers

Financial benefits

  • Monthly savings of 70–100% on electricity bill
  • Protection against annual tariff increases
  • Payback period of 2.5–4 years in the FESCO region
  • System lifespan of 25+ years with minimal maintenance
  • Property value increase of 5–10%
  • No sales tax on solar equipment imports
  • Net metering credits for excess generation

Frequently Asked Questions

How to apply for FESCO net metering?

Install NEPRA-approved solar system, submit application with documents to FESCO's Generation Licensing. FESCO inspects, replaces meter, and activates net metering.

How much does solar net metering cost?

5 kW system: Rs 420,000–600,000 plus Rs 15,000–25,000 for bidirectional meter. Payback in 2.5–4 years.

How long for FESCO approval?

30–60 days from application to activation.

Can commercial FESCO consumers get net metering?

Yes. Up to 1 MW for three-phase. Textile and industrial units can significantly cut operational costs.

What happens to excess credits?

Roll over monthly. Year-end excess compensated at NEPRA buy-back rate.

Is solar viable in Faisalabad?

Excellent. 5–6.5 peak sun hours daily. Among the best regions in Pakistan for solar.

Do I need to upgrade my FESCO connection?

Only if your solar system exceeds your sanctioned load. Otherwise, no upgrade needed.

Can I use batteries with net metering?

Yes. Hybrid systems with batteries for backup and net metering for grid export are permitted.

Are there government incentives?

Solar equipment is sales tax exempt. Some provincial programs may offer subsidized financing.

What warranty should I expect?

Panels: 25-year performance warranty. Inverter: 5–10 years. Installation workmanship: minimum 2 years.